Lead-safe job checklist for painting contractors

What must be done before, during and after a covered painting job?

Before the job starts

Before work begins, confirm the build year, deliver the pamphlet and get proof it was received. Do this even if the crew starts tomorrow.

Give the Renovate Right pamphlet to the owner no more than 60 days before work begins. Get a signed acknowledgment with name, address, signature and date, or a certificate of mailing at least 7 days before. Record any lead test result in the file.

60 daysFirms must deliver the pamphlet no more than 60 days before work, and keep a written acknowledgment or proof of mailing. — 40 CFR 745.84, Cornell LII, retrieved 2026-09-29

Day one, signs and containment

Post signs, then contain. The certified renovator is on site for both.

Inside, cover floors with plastic sheeting extending at least 6 feet beyond the work surface, seal ducts, and cover windows and doors as needed. Outside, cover the ground at least 10 feet out from the work. Keep signs up until cleanup is done.

6 ft inside, 10 ft outsideInterior work needs plastic sheeting on floors 6 feet or more beyond work surfaces, and exterior work needs ground covering 10 feet or more from the renovation. — 40 CFR 745.85, Cornell LII, retrieved 2026-09-29

Methods that are off the table

Three methods are prohibited on painted surfaces in covered work. Leave them out of every estimate.

If a bid depends on a torch or an unshrouded sander, the bid is wrong. Reprice it with a compliant method.

Prohibited practices in covered lead-safe painting work
MethodWhat the rule says
Open-flame burning or torchingProhibited on painted surfaces
Sanding, grinding or blasting at high speedProhibited without a HEPA vacuum system
Heat gunProhibited above 1,100 degrees Fahrenheit

1,100 degrees FThe rule prohibits open-flame burning, high-speed paint removal without HEPA vacuum systems, and heat guns operating above 1,100 degrees Fahrenheit. — 40 CFR 745.85, Cornell LII, retrieved 2026-09-29

After the work, cleaning and records

Clean, verify, then take signs down, in that order. The renovator verifies before signs come down.

Clean with HEPA vacuums and damp cloths. The renovator inspects and checks windowsills and floors with cleaning verification cards. Keep the records, including the acknowledgment, test results and verification, for 3 years.

A certified renovator must visually inspect for remaining dust and debris and use cleaning verification cards before warning signs are removed. — 40 CFR 745.85, Cornell LII, retrieved 2026-09-29

Required records include signed acknowledgments, lead determination reports, proof a certified renovator was assigned, and cleaning verification results. — 40 CFR 745.86, Cornell LII, retrieved 2026-09-29

Closing out the file

Send the owner the compliance information with the final invoice, or within 30 days of finishing, whichever is earlier. Then file the copy.

Go through the 1962 repaint scenario once if you want to see this in order on a real house. Check the firm and renovator page if you are unsure who signs off on what.

30 daysThe firm must provide compliance information to the owner when the final invoice is delivered or within 30 days of completion, whichever is earlier. — 40 CFR 745.86, Cornell LII, retrieved 2026-09-29

Questions

Do I need a separate checklist for exterior jobs?

The steps are the same. Only the containment differs, with ground cover extending at least 10 feet outside instead of floor sheeting at least 6 feet inside. Signs, verification and records apply to both.

Who signs off on cleaning verification?

The certified renovator does. The rule requires the renovator to inspect and verify with cleaning verification cards before the warning signs come down.

Can dust clearance testing replace the verification cards?

The rule allows dust clearance sampling as an alternative when a contract or local rule requires it. Otherwise the cleaning verification procedure applies.